ABOUT

Rehm Diving well Renovations

Rehm Pool is undergoing an exciting transformation! The diving well will be replaced with fun water activities for all ages, including two waterslides, a lily pad crossing, and a current channel. These renovations address structural concerns with the aging diving well.

Check out the latest updates:

March
Pool stair concrete poured.
concrete is smoothed in pool stair molds
March
Electrical tubing installed and tile color and material selected.
black electrical tubes run along the pool wall
black electrical tubes run along the pool wall
white and blue tile sample on pool wall
March
Roof trusses installed, with roof to be installed the week of March 17.
pumphouse roof framed out
closeup of piping into pumphouse
closeup of piping into pumphouse
March
Concrete poured into the pool wall frames. Frames will be removed once concrete sets.
concrete poured for pool walls
concrete is poured from long hose into pool wall frames
March
Pool wall work continues. Check out the new current channel!
rehm pool current channel walls
rehm pool construction site
February
Pool wall installed amidst snowy conditions.
snow covers tarps and construction workers uncover a corner to show pool wall frames
February
Concrete poured on February 4. The team worked hard to beat the incoming rain and ice.
concrete piped from truck to pool floor
January
Gravel compacted and rebar installed.
gravel compacted at bottom of pool area
January
Piping under the pool shell completed and inspected.
bottom of rehm pool with exposed pipes
November-December
Path work done on the new pumphouse building, in addition to laying foundations, footings, and masonry walls.
pumphouse structure made of cinderblocks
September
Existing diving well structure removed and the hole filled.
rehm pool diving well with two drop slides and a diving board