ABOUT

Field Center Construction

A new Field Center is being built! Construction is estimated to be completed in June 2026.

The old Field Center will remain open throughout construction to allow programming to continue. The 3-5 year old playground and splashpad will remain open as long as the project allows. Scroll for renovation updates and photos.

The existing building was slated for decommissioning in the Park District’s last 10-year master plan, but the demand for childcare has created the need to expand the Center. To identify an architect for the new building, the Park District conducted a design competition. This was a callback to the 1926 design competition that was put on to construct the original Field Center. Learn more about the design competition by clicking here.

Check out the latest updates:

November
Foundation walls are being prepared for pouring. Due to pending weather (snow and single digits), the pour has been delayed and will occur once the temps are above freezing and stable.
wall forms covered in plastic
wall forms covered in plastic
November
Concrete foundation wall forms are onsite and installation has begun.
November
Column footings have been poured, with foundation wall forming coming soon.
column footings at field center construction site
column footings at field center construction site
column footings at field center construction site
October
Strip footing excavations for east, south, and west walls complete. Rebar placement and forming of strip footings in progress.
October
Forms for the foundation wall were put in.
deep channel is cut through the dirt with wood framing on either side
deep channel is cut through the dirt with wood framing on either side
deep channel is cut through the dirt with wood framing on either side
August
Fencing went up and initial demolition began.