Rehm Park & Pool

Plan Created: 2008
Plan Reviewed: 2026
Next Review: TBD
Construction Completion: N/A

Continued investment in our parks and facilities is critical to the District’s mission. The Park Board’s policy states that each park site plan will be revisited and updated within a 10-year period. The Park District is in the process of revisiting each park site plan per this policy in order to identify additional park amenities desired by our residents, to budget strategically for these improvements and to be prepared for grant opportunities.

If you have questions or would like to provide feedback on park plans currently in progress, please contact Bill Hamilton, Superintendent of Parks & Planning. (opens email app)

Past Plans

Check out the latest updates:

Timeline Icon

May

We celebrated the official opening of Rehm Pool for the 2026 season!

ten park district staff, board members, and project team members cut a blue ribbon in front of the completed rehm pool activity pool
Timeline Icon
A multi-level water slide complex with blue and green tubes, featuring a blue staircase leading to the top, emptying into a swimming pool at Rehm

November

Pool filled and waterslides tested in preparation for permitting.

Timeline Icon

October

Pool tiles and lily pad crossing structures installed.

Rehm Park & Pool under construction, featuring an empty pool basin with safety equipment and building in the background.
Timeline Icon
Blue and green spiral water slides with blue stairs at Rehm Park & Pool.

August

Waterslides installed.

Timeline Icon

July

The pool deck is being poured, a process that requires seven truckloads of concrete.

Construction workers pour concrete into a pool basin at Rehm Park & Pool using a concrete pump.
Timeline Icon
Industrial pumps and piping system in a concrete room at Rehm Park & Pool.

June

The interior of the filter house is nearing completion. Drain pipes are being installed, then the deck will be poured. The interior of the pool is being prepped for tiling.

Timeline Icon

May

Pump house is being bricked and lights cut during excavation were reestablished.

Construction of Rehm Park & Pool exterior wall with insulation and brick veneer in progress. Metal ties protrude from cinder
Timeline Icon
Construction of Rehm Park & Pool, showing a partially filled pool, a building under construction, and an excavator.

April

Work on the pump room continues. Water hold test was conducted to check for leaks.

Timeline Icon

April

Piers for waterslides poured and installed.

Construction site at Rehm Park & Pool with concrete forms for pillars and a concrete pump hose.
Timeline Icon
Construction of a shade trellis structure at Rehm Park & Pool with scaffolding and building materials visible.

April

Shade trellises installed.

Timeline Icon

March-April

Pool stair concrete poured.

Newly poured concrete steps at Rehm Park & Pool construction site. A building and construction materials are visible in the
Timeline Icon
Construction of a curved pool edge with white tiles and blue mosaic tiles being installed.

March

Electrical tubing installed and tile color and material selected.

Timeline Icon

March

Roof trusses installed, with roof to be installed the week of March 17.

Construction of Rehm Park & Pool building with cinder block walls and wooden roof trusses. Foundation work is visible in the
Timeline Icon
Construction of Rehm Park & Pool: concrete pump truck pouring foundation walls, with cinder block building in background.

March

Concrete poured into the pool wall frames. Frames will be removed once concrete sets.

Timeline Icon

March

Pool wall work continues. Check out the new current channel!

Construction of Rehm Park & Pool shows concrete forms for a pool and a cinder block building under construction.
Timeline Icon
Construction workers in winter conditions building a pool foundation with rebar and wooden forms at Rehm Park & Pool.

February

Pool wall installed amidst snowy conditions.

Timeline Icon

February

Concrete poured on February 4. The team worked hard to beat the incoming rain and ice.

Construction workers pour concrete using a pump truck at the Rehm Park & Pool site.
Timeline Icon
Rehm Park & Pool construction site with foundation forms and rebar in place, and a building under construction in the

January

Gravel compacted and rebar installed.

Timeline Icon

January

Piping under the pool shell completed and inspected.

Construction site with concrete foundation, rebar, and plumbing pipes laid out. A worker operates a compactor.
Timeline Icon
Construction of the Rehm Park & Pool pumphouse, showing cinder block walls and exposed foundation with rebar.

November-December

Path work done on the new pumphouse building, in addition to laying foundations, footings, and masonry walls.

Timeline Icon

September

Existing diving well structure removed and the hole filled.

Rehm Park & Pool features a bright blue swimming pool with two blue water slides, a diving board, and surrounding concrete

Acquired in 1913, Rehm Park was originally called “South Park” but was subsequently renamed after Colonel Arthur D. Rehm, a member of the Park District’s first Board of Commissioners and its second Board President. The original park was designed by Jens Jensen, although little of Jensen’s design remains. The play train has been at Rehm playground since at least 1960. An outdoor pool was constructed in 1966 and quickly became a destination. While remediation was taking place at Barrie Park in 2001, Rehm hosted the “Temporary Barrie Center” double-wide trailer north of the diving well.

Playground equipment was replaced in 2002, as part of the Barrie Park remediation agreement with ComEd. In 1996, pool repairs included renovation of all decks and piping, creation of a zero-edge entry, addition of a wading pool and sand play, and improvements to concessions. Additional pool repairs in 1999-2000, included replacement of the sand filter equipment and lockers. Minor gutter repair was undertaken in 2006. A site master plan for Rehm Park was completed in 2008. The stairs to the platform diving boards were repaired in 2009. In 2009, two competitive play sand volleyball courts were constructed, replacing two courts previously located in Longfellow Park. In 2010, the pool filter system was replaced, new shade structures, and a burglar/fire alarm were installed. Master plan improvements started in 2011, with a total of $250,000 allocated for improvements. Improvements included a revised play train foundation and track, a new train storage tunnel, playground surfacing, walkways, fencing and landscaping. A pool master plan was being completed in 2014. A complete park renovation was completed again in 2021 as an OSLAD project.