Loading…

Longfellow Park & Center

Plan Created: 2006
Plan Reviewed: 2023
Next Review: 2030
Construction Completion: Fall 2026

Current Plan

Past Plans

Check out the latest updates:

Timeline Icon

September

Asphalt for the courts has been poured.

steam rollers work on the new pickleball court surface
Timeline Icon
green turf coats the ground underneath the blue playground equipment

August

Forever Lawn is being installed in playground area.

Timeline Icon

August

August
green and blue splash pad amenities
Timeline Icon
Newly poured concrete splash pad area at Longfellow Park, with surrounding construction materials and playground equipment

August

Asphalt work to begin on pickleball courts and basketball courts in mid-August. Splash pad surface poured.

Timeline Icon

July

Splash pad area is ready for concrete pour. Shade structures were installed over the court area.

Construction of a splash pad at Longfellow Park, featuring abstract metal sculptures and landscaping in progress.
Timeline Icon
Construction of a paved patio area at Longfellow Park, with a brick building and materials in the background.

July

Pavers are being installed and asphalt work is beginning on the courts.

Timeline Icon

July

Playground assembly is near completion and surface is being prepared for forever lawn installation.

New playground equipment with blue accents and a communication board is installed at Longfellow Park. Construction fencing is visible.
Timeline Icon
Construction of a new playground structure at Longfellow Park, featuring climbing elements and support poles. Workers are present, and safety netting

June

Assembly of the playground is underway!

Timeline Icon

May

Sidewalks have been poured and playground and splash pad equipment is on site.

Construction of new pathways and landscaping at Longfellow Park. A person walks in the distance.
Timeline Icon
Construction at Longfellow Park (facilities_dir_ltg) with an excavator and workers preparing pathways.

May

Preparation for curb and sidewalk pours is almost complete. Playground, splash pad, and portland loo equipment has been shipped.

Timeline Icon

April

Sidewalk and curb framing underway.

Construction workers and heavy machinery are present at a site for Longfellow Park (facilities_dir_ltg). Forms for concrete are set up, and orange
Timeline Icon
Colorful metal sculpture featuring silhouetted figures in front of a brick building at Longfellow Park.

April

New art installation by Shencheng Xu and donated by the Parks Foundation of Oak Park, titled "Safe Haven."

Timeline Icon

March

Playground equipment was donated to Kids Around the World. Staff came to disassemble the playground, and will upcycle the equipment for playgrounds in under-resourced areas.

Construction workers assemble playground equipment at Longfellow Park under a cloudy sky. New blue and yellow structures are partially built.

Longfellow Park was one of the earliest properties purchased by the Park District. Acquired in 1920, the park was named after the American poet, Henry Wadsworth Longfellow. The recreation center was built in 1966, in the same style as Fox Center.

The site master plan for Longfellow Park was completed in February 2007. Center improvements completed in 2008, included: making the restrooms ADA accessible and creating both interior and exterior access, installing an elevator, upgrading restroom fixtures and ventilation systems, creating a viewing area for the upper level program room, creating a customer service kiosk, improving common areas, and reorganizing office workspace. In 2008, replacement of the Center’s air conditioning system was also completed. Park master plan improvements constructed in 2008, included new accessible and creative playground equipment, a new splash pad, a ramp to gain access to the restrooms, a new north entranceway to the center, a walkway around the center, and a renovated entryway plaza on the south side of the center with additional seating. Other improvements included benches, drinking fountains, bicycle racks, landscaping, and lighting. The “sunken area” north of the center was filled in and a new full-sized basketball court with spectator area was installed. The play areas were relocated from the northwest corner of the park to a more central location allowing for parental monitoring of both the playground and the ball field. Sand volleyball courts were relocated to Rehm Park. At the southeast corner of the park, a brick ballfield plaza was created and a drinking fountain and bicycle rack were added. A significant percentage of this project was funded through grant dollars.

In 2011, the windows were replaced in the Center. Irrigation was installed on the sports fields in 2013. In 2014, improvements were made to the ball field and spectator areas. In 2016, the entry retaining walls and ADA ramps were re-built & a new roof was installed to allow for the addition of solar panels in 2017, and 2018. In 2016, a cistern was installed to collect water from the splash pad and repurpose that water
for the irrigation of the sports fields. In 2026 the District is replacing the tennis courts with pickleball courts, adding a sensory garden and replacing the playgrounds and surfaces.