Andersen Park & Center

Plan Created: 2005
Plan Reviewed: 2025
Next Review: TBD
Construction Completion: N/A

Continued investment in our parks and facilities is critical to the District’s mission. The Park Board’s policy states that each park site plan will be revisited and updated within a 10-year period. The Park District is in the process of revisiting each park site plan per this policy in order to identify additional park amenities desired by our residents, to budget strategically for these improvements and to be prepared for grant opportunities.

If you have questions or would like to provide feedback on park plans currently in progress, please contact Bill Hamilton, Superintendent of Parks & Planning. (opens email app)

Current Plan

Past Plans

Completed November 2025

Check out the latest updates

Timeline Icon

November

Perimeter fence was installed, and the playground is reopened!

Playground structure with orange slide and stairs at Andersen Park, surrounded by trees with autumn foliage.
Timeline Icon
Sign for Andersen Park, part of the Park District of Oak Park, with a stone wall and pathway.

August

New playground equipment installed, plus natural play area features and new entrance.

Timeline Icon

July

New playground equipment getting installed.

Playground construction at Andersen Park, featuring new equipment, materials, and a skid steer loader.
Timeline Icon
Andersen Park playground under renovation, showing new concrete forms for a circular structure and a playground set in the

May

Work continues quickly on curb forms. The team is waiting on some supplies to be shipped in.

Timeline Icon

April

Work is underway on splash pad grading and site utilities.

Andersen Park playground under construction with mulch piles, safety fencing, and heavy equipment.
Timeline Icon
Andersen Park: A metal swing set frame stands on a mulched ground, with a red safety fence and houses in the background.

April

Fencing went up and excavation and demolition of the playground area and splash pad began.

Acquired in 1916, the park is named after children’s author Hans Christian Andersen and includes a recreation center originally designed by John S. Van Bergen. The center has been significantly modified over the years. The play equipment was previously renovated in 1985.

The site master plan for Andersen Park was completed in January 2006 and updated in 2014. Initial improvements were completed in September 2006. These improvements included: new playground equipment, splash pad, roll hill, walkways, drinking fountain, bicycle rack, security lighting, replacement fencing, woven willow dome, interpretive signage, landscaping, and decorative paved seating areas. In 2006, Andersen Center improvements were also made including roof repair and lock and door replacement. An upgrade of the local fire alarm system was completed in 2008, which replaced the circa 1965 system. The new system allows for constant fire/smoke detection and direct communication alerts to emergency agencies. Replacement park benches were installed in 2008.

Center improvements in 2010, made the restrooms accessible when no staff is present, and addressed small-scale maintenance needs (e.g., painting, tuck pointing, tile replacement). In 2011, a new exterior accessible restroom was constructed for the Center. There were aesthetic and deferred maintenance improvements completed at Andersen Center in 2018, including a new roof and interior upgrades. In 2025 outdoor fitness equipment was added, as well as shade, the playground was replaced and improvements were made to the splash pad.